ASSDA Member and Accredited Fabricator Arcus Wire Group has delivered an innovative duplex stainless steel wire rope cable solution for a hydropower project in the Middle East.
The 344MW Kokhav Hayarden pumped storage hydropower plant is located 120km northeast of Tel Aviv. The project is the first and largest of its kind in Israel, as well as the lowest of its kind globally. The powerhouse lies 275m below sea level and features two 3.1 million m3 reservoirs at different heights. Expected to be operational in early 2023, the hydropower station is designed to provide flexible backup power and stability